Chu Linh – Coc San hydropower at Laocai

Chu Linh – Coc San hydropower at Laocai

16:50 - 14/08/2020

Chu Linh – Coc San hydropower at Laocai

Project scale:

Chu Linh -Coc San hydropower plant: 44 MW

Project value:

Phase 1: Chu Linh -Coc San hydropower plant: 30 triệu USD

Phase 2: Chu Linh -Coc San hydropower plant: 15 triệu USD

Operation duration: 50 years

Capital contribution rate: 19% of capital.

 